Pier Mooring Wharf Construction Technology

  1. TOP
  2. Technology and Solutions
  3. Pier Mooring Wharf Construction Technology

Pier Mooring Wharf Construction Technology

Pier mooring is a mooring facility often used at ports and harbors.It has a light structure with floorboards placed on columns such as steel pipe piles driven into the bottom of the water, making it suitable for locations where the ground is soft.

Outline of Pier Mooring Wharf Construction Technology

Steel pipe piles use machines that strike or vibrate the piles and penetrate deep into the water.At the time of penetration, efficient construction is carried out using a construction support system that utilizes ICT technology.After placing steel pipe piles, the foundation is reinforced with rubble to suppress the displacement of the pile head, and then the floor slab is constructed.For the floor slab, there is a method to assemble the form and directly place the concrete and a method to install the floor slab of the concrete secondary product. As maintaining existing quays is important, we are developing technologies for constructing easy-to-maintain pier type quays and for seismic reinforcement of piers.

Construction Flow

1. Steel Pipe Pile Penetration

2. Foundation Work

3. Floor panel construction

Our technology Used in the Construction of Pier Mooring Wharf Construction Technology

Re-Pier Method

This construction method is capable of responding to the earthquake resistance, deterioration, and increasing size of vessels at low cost with a short construction period while the facilities are in service.

Construction Results

Construction Work of a wharf at Sasebo Port

Sasebo City, Nagasaki Pref

Main Body Construction Work, South Quay of Tobishima Pier in Nagoya Port

Tobishima Village, Aichi Pref

Disaster Recovery Work of West Wharf Sightseeing Bridge

Shiogama City, Miyagi Pref

Repair Work of No. 3 Pier at Toyota Motor Corporation's Yokohama Office

Yokohama City, Kanagawa Pref

ページトップへ

About us

  • About us

Technology and Solutions

  • Port and Airport Technology
  • Soil Improvement Technology
  • Disaster Prevention and Reduction Technology
  • Environment-Related Technology

Projects

  • Airport
  • Port and Coast
  • Soil Improvement
  • Transportation and Shipping
  • Flood Control
  • Environmental Conservation
  • Maintenance and Repair
  • Oversea

Corporate Profile

  • Message from the President
  • Corporate Philosophy
  • Corporate Policy
  • Directors,Officers
  • History
  • Organization Chart
  • Offices
  • Financial Information

Other

  • Privacy Policy
  • Use of the Website

あおみ建設株式会社

Sumitomofudosan Ochanomizu building, 2-2-3 Sotokanda, Chiyoda-ku, Tokyo, 101-0021, Japan
TEL: (+81)3-5209-7761 (the main phone number of a company)

Copyright © AOMI CONSTRUCTION CO.,LTD. All Rights Reserved.